Red Extract Ventilation Modification

Existing facility, under improvement notice, needing replacement ductwork and extract fans. Many logistic issues, location, space, limited time to instigate switch over. Scope included:-

  • Laser scan / point cloud the existing area / convert into Revit.
  • Deliver a mechanical and EC+I detailed design.
  • Support client in the technical aspects of the supply chain.
  • Undertake the manufacture design for the ductwork and control panel.
  • Attend and accept all FAT tests.
  • Assist in the regulator demonstration of the trail build.
  • Vendor Design Approval – I.A.W Codes and Standards.
  • Manufacture Design, mechanical and EC+I.
  • Factory Acceptance Testing – Design Intent Verification.